Same Day Report GUARANTEED or Your Money Back !
Same Day Report GUARANTEED or Your Money Back !
Independent new home inspections across Melbourne at every stage of construction, from pre-slab to handover. We work for you, not the builder, and every inspection comes with a written report and photos, delivered the same day.
Building a new home is one of the biggest purchases you'll make, and most of the work is covered up before you ever see it. Once the slab is poured, the frame is lined and the walls are painted, defects underneath are hard to find and expensive to fix.
Your builder runs their own quality checks, and your building surveyor carries out the mandatory inspections required under the building permit. Both matter, but neither is there to check workmanship quality on your behalf. The builder's supervisor is checking their own company's work. The surveyor's mandatory inspections focus on compliance at set points in the build. They are not a detailed review of workmanship, and they aren't written for you.
An independent inspector looks at what has actually been built: whether it matches the plans, whether it meets the National Construction Code (NCC) and the relevant Australian Standards, and whether it has been done to an acceptable standard of workmanship. You get a clear report you can hand straight to your builder.


We inspect at five points during a build. Each one is timed so problems are found while they can still be seen and fixed easily. For everything we look at at each stage, see our detailed stage inspection checklist.
When to book: after the reinforcement, plumbing penetrations and vapour barrier are in place, and before the concrete pour.
What we check: slab and footing set-out against the plans, reinforcement placement, laps, ties and bar chairs, concrete cover at edges, the vapour barrier and its taping, termite management at penetrations, and set-downs for wet areas. Residential slabs and footings are designed under AS 2870.
Common defects: reinforcement sitting directly on the vapour barrier, torn or untaped membrane, poor edge cover, and missing set-downs for showers.
When to book: once the frame is fully up, braced and tied down, and before insulation and plasterboard go in.
What we check: wall and roof framing against the plans and AS 1684, bracing and tie-downs, lintels and beams, walls for plumb and straightness, trusses and their connections, and notching or drilling of framing members.
Common defects: missing or loose bracing, over-notched studs, out-of-plumb walls, damaged trusses and missing tie-down fixings. These are simple to fix now and very hard to fix once the plaster is up.
When to book: when the external walls, roof covering, windows and external doors are installed.
What we check: brickwork and cladding (masonry against AS 3700 and AS 4773), weep holes, flashings and damp-proof courses, window installation and flashing, roof covering and sarking, and articulation joints.
Common defects: mortar bridging the wall cavity, missing or blocked weep holes, damaged or poorly fixed flashings, cracked bricks, and windows not properly sealed.
When to book: during the internal fit-out, once linings, doors and cabinetry are going in. Wet areas are best seen after the waterproofing membrane is applied and before tiling, so call us and we'll help you time it with your builder.
What we check: plasterboard, set joints and cornices, door and cabinetry installation, wet area waterproofing against AS 3740, falls to floor wastes, and upturns at hobs and doorways.
Common defects: membranes not taken high enough, missing bond breakers at junctions, poor falls to floor wastes, damaged plasterboard, and doors that bind.
When to book: when your builder gives notice that the home has reached practical completion, before you sign off and before you make the final payment. This is your handover inspection.
What we check: the whole home, inside and out — finishes, roof space, wet areas, doors and windows, paths and drainage around the house, and workmanship generally — plus whether defects from earlier stages have been fixed.
Common defects: paint and plaster finish defects, cracked or drummy tiles, poor sealant in wet areas, doors and windows that don't operate properly, and incomplete or missing work. For a full list, see our pre-handover defect inspection checklist.
Every inspection includes a written report with photos, delivered the same day.
Each stage report is written for you, the owner, not for the builder. It lists every defect we find, where it is in the home and why it matters, with clear photos so your builder can locate each item without a site meeting. Where an item doesn't appear to meet the NCC or the relevant Australian Standard, we say so in plain English, and we flag anything that needs urgent attention before the next stage starts.
The report is set out so you can forward it to your builder as it is. Many owners send it with a short covering email asking for each item to be addressed before the next stage payment. Because you receive it the same day, there is time to raise items while the trades are still on site and the work is still exposed.
If you're not sure what an item means or how serious it is, call us. We'll explain it in plain language and tell you what to ask your builder.
You can book any stage on its own, and many owners book only the PCI. That's far better than nothing, but by handover the slab, frame and most of the structure are hidden behind linings and finishes. A PCI can only report what is visible on the day.
Booking every stage means each part of the build is checked while it can still be seen and fixed. If you're unsure which stages to book, call us and we'll talk it through against your build schedule.
Our report sets out each defect, where it is and why it matters, with photos. Send it to your builder in writing and ask for each item to be addressed.
Your builder's obligations come from your building contract and the warranties in section 8 of the Domestic Building Contracts Act 1995 (Vic). These include that the work will be carried out in a proper and workmanlike manner, in accordance with the plans and specifications, and in accordance with the law.
Ask for defects to be rectified before handover and before you make the final payment.
If your builder doesn't fix the defects, you can lodge a dispute with Domestic Building Dispute Resolution Victoria (DBDRV). If it still isn't resolved, it can go to VCAT.
A report doesn't force a builder to do anything on its own. What it gives you is clear, independent evidence to back your position at each step.
Our team brings 50+ years of combined building experience and has completed 6,500+ inspections, with a 4.9-star rating from 520+ Google reviews.
DC Building Inspectors is led by director David Dunat, a registered Domestic Builder (Unlimited), DB-U 66182, and registered Quantity Surveyor, QS 74065, with a Bachelor of Applied Science (Construction Management). Registrations can be checked on the public register of the Building and Plumbing Commission (formerly the VBA).
You receive your written report with photos on the day of your inspection. If it isn't delivered the same day, you get your money back. On a new build that matters: builders move quickly between stages, and a report that arrives a week later can arrive after the work has been covered up.
Can't see your question here? Call us on 0483 936 872, 7 days, 7:30am–9:00pm.
As soon as your builder gives notice of practical completion, and before you sign the handover documents or make the final payment. That leaves time for defects to be fixed before you move in.
Yes, you're welcome to attend, and we can walk you through what we find.
Your right to access the site comes from your building contract, so check its access clause and give your builder notice. We'll work with you on timing.
Put your request in writing with our report attached, referring to your contract and the section 8 warranties. If it still isn't resolved, you can go to DBDRV, and then VCAT.
Yes. We inspect new houses, townhouses and units, including off-the-plan purchases.
The same day as the inspection, or your money back.
Each construction stage inspection is $600. The practical completion (PCI) inspection is $695.
All of Melbourne, including Mornington and Sunbury at no extra charge.
Choose your stage and book online, or call 0483 936 872. We're available 7 days, 7:30am–9:00pm.
DC Building Inspectors
Tel: 0483 936 872